{"id":993099,"date":"2026-04-01T09:59:31","date_gmt":"2026-04-01T09:59:31","guid":{"rendered":"https:\/\/www.vitrans-conveyor.com\/?p=993099"},"modified":"2026-04-01T09:59:42","modified_gmt":"2026-04-01T09:59:42","slug":"conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing","status":"publish","type":"post","link":"https:\/\/www.vitrans-conveyor.com\/vi\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/","title":{"rendered":"Danh s\u00e1ch ki\u1ec3m tra \u0111\u00e1nh gi\u00e1 nh\u00e0 cung c\u1ea5p b\u0103ng t\u1ea3i: 15 c\u00e2u h\u1ecfi c\u1ea7n \u0111\u1eb7t ra tr\u01b0\u1edbc khi k\u00fd h\u1ee3p \u0111\u1ed3ng"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<h2 class=\"wp-block-heading\" id=\"h-introduction\">Introduction<\/h2>\n\n\n\n<p>Purchasing a conveyor system is a <strong>significant capital investment<\/strong> \u2014 often ranging from $50,000 to $500,000+ depending on your production line requirements. Yet many manufacturers rush into contracts without properly vetting suppliers, leading to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u274c <strong>Delivery delays<\/strong> that halt production for weeks<\/li>\n\n\n\n<li>\u274c <strong>Quality issues<\/strong> requiring expensive rework or replacement<\/li>\n\n\n\n<li>\u274c <strong>Poor after-sales support<\/strong> leaving you stranded when breakdowns occur<\/li>\n\n\n\n<li>\u274c <strong>Hidden costs<\/strong> that blow your budget by 30-50%<\/li>\n<\/ul>\n\n\n\n<p>At <strong>Vitrans<\/strong>, we&#8217;ve seen countless examples of companies learning these lessons the hard way. That&#8217;s why we&#8217;ve created this comprehensive <strong>15-point supplier evaluation checklist<\/strong> to help you make informed decisions.<\/p>\n\n\n\n<p><strong>Download the printable PDF version at the end of this article.<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-section-1-company-background-amp-stability-questions-1-3\">Section 1: Company Background &amp; Stability (Questions 1-3)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-1-how-long-has-the-supplier-been-in-business\">\u2705 Question 1: How long has the supplier been in business?<\/h3>\n\n\n\n<p><strong>What to <\/strong><strong>look for<\/strong><strong>:<\/strong> Minimum 5+ years of operation<\/p>\n\n\n\n<p><strong>Why it matters:<\/strong> Conveyor manufacturing requires deep engineering expertise and proven processes. Newer companies may lack:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Refined design methodologies<\/li>\n\n\n\n<li>Established quality control systems<\/li>\n\n\n\n<li>Financial stability to honor warranties<\/li>\n\n\n\n<li>Track record of completed projects<\/li>\n<\/ul>\n\n\n\n<p><strong>Red flags:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Company less than 3 years old<\/li>\n\n\n\n<li>Frequent name changes or restructuring<\/li>\n\n\n\n<li>No verifiable project history<\/li>\n<\/ul>\n\n\n\n<p><strong>Vitrans advantage:<\/strong> With over [X] years in conveyor manufacturing, Vitrans has completed [X]+ projects across automotive, electronics, food processing, and logistics industries.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-2-can-they-provide-references-from-similar-industries\">\u2705 Question 2: Can they provide references from similar industries?<\/h3>\n\n\n\n<p><strong>What to <\/strong><strong>look for<\/strong><strong>:<\/strong> 3-5 recent references in your sector<\/p>\n\n\n\n<p><strong>Why it matters:<\/strong> Different industries have unique requirements:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Industry<\/th><th>Key Requirements<\/th><\/tr><\/thead><tbody><tr><td>Automotive<\/td><td>Heavy load capacity, precision positioning<\/td><\/tr><tr><td>Electronics<\/td><td>ESD protection, clean room compatibility<\/td><\/tr><tr><td>Food Processing<\/td><td>Stainless steel, washdown ratings, USDA compliance<\/td><\/tr><tr><td>Logistics<\/td><td>High speed, sortation integration, scalability<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Action step:<\/strong> Actually call the references. Ask about:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>On-time delivery performance<\/li>\n\n\n\n<li>Quality of installation support<\/li>\n\n\n\n<li>Response time for service calls<\/li>\n\n\n\n<li>Overall satisfaction 12+ months post-installation<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-3-what-is-their-annual-production-capacity\">\u2705 Question 3: What is their annual production capacity?<\/h3>\n\n\n\n<p><strong>What to <\/strong><strong>look for<\/strong><strong>:<\/strong> Capacity that matches your timeline needs<\/p>\n\n\n\n<p><strong>Why it matters:<\/strong> A supplier operating at 95%+ capacity may struggle with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Rush orders or timeline changes<\/li>\n\n\n\n<li>Quality consistency during peak periods<\/li>\n\n\n\n<li>Dedicated attention to your project<\/li>\n<\/ul>\n\n\n\n<p><strong>Good signs:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Operating at 70-85% capacity (room for your project)<\/li>\n\n\n\n<li>Multiple production lines<\/li>\n\n\n\n<li>Scalable manufacturing partnerships<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-section-2-engineering-amp-technical-capability-questions-4-7\">Section 2: Engineering &amp; Technical Capability (Questions 4-7)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-4-do-they-have-in-house-engineering-staff\">\u2705 Question 4: Do they have in-house engineering staff?<\/h3>\n\n\n\n<p><strong>What to <\/strong><strong>look for<\/strong><strong>:<\/strong> Dedicated mechanical, electrical, and controls engineers<\/p>\n\n\n\n<p><strong>Why it matters:<\/strong> In-house engineering means:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Faster design iterations<\/li>\n\n\n\n<li>Better problem-solving during installation<\/li>\n\n\n\n<li>Direct accountability (no outsourcing blame games)<\/li>\n<\/ul>\n\n\n\n<p><strong>Ask to see:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineering team organizational chart<\/li>\n\n\n\n<li>Certifications (Professional Engineer licenses)<\/li>\n\n\n\n<li>CAD\/CAM software capabilities<\/li>\n<\/ul>\n\n\n\n<p><strong>Red flag:<\/strong> All engineering outsourced to third-party firms<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-5-can-they-provide-detailed-cad-drawings-before-production\">\u2705 Question 5: Can they provide detailed CAD drawings before production?<\/h3>\n\n\n\n<p><strong>What to <\/strong><strong>look for<\/strong><strong>:<\/strong> 3D models, layout drawings, foundation plans<\/p>\n\n\n\n<p><strong>Deliverables should include:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Overall layout with dimensions<\/li>\n\n\n\n<li>Component-level assembly drawings<\/li>\n\n\n\n<li>Electrical schematics<\/li>\n\n\n\n<li>Foundation and anchoring requirements<\/li>\n\n\n\n<li>Utility connection points (power, air, etc.)<\/li>\n<\/ul>\n\n\n\n<p><strong>Vitrans standard:<\/strong> We provide complete CAD packages within 5-7 business days of order confirmation, with unlimited revision rounds during approval.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-6-what-testing-procedures-do-they-follow\">\u2705 Question 6: What testing procedures do they follow?<\/h3>\n\n\n\n<p><strong>What to <\/strong><strong>look for<\/strong><strong>:<\/strong> Documented FAT (Factory Acceptance Testing) protocols<\/p>\n\n\n\n<p><strong>Standard tests should include:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Test Type<\/th><th>Duration<\/th><th>What to Verify<\/th><\/tr><\/thead><tbody><tr><td>No-load run<\/td><td>2-4 hours<\/td><td>Smooth operation, noise levels, alignment<\/td><\/tr><tr><td>Load test<\/td><td>4-8 hours<\/td><td>Performance at rated capacity<\/td><\/tr><tr><td>Endurance test<\/td><td>24-72 hours<\/td><td>Reliability under continuous operation<\/td><\/tr><tr><td>Safety check<\/td><td>1-2 hours<\/td><td>Emergency stops, guards, interlocks<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Best practice:<\/strong> Request video documentation of FAT before shipment. Even better \u2014 attend in person for critical systems.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-7-do-they-offer-custom-engineering-or-only-standard-products\">\u2705 Question 7: Do they offer custom engineering or only standard products?<\/h3>\n\n\n\n<p><strong>What to look for:<\/strong> Flexibility to adapt to your specific needs<\/p>\n\n\n\n<p><strong>When customization matters:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Unusual product sizes or weights<\/li>\n\n\n\n<li>Special environmental conditions (temperature, humidity, cleanliness)<\/li>\n\n\n\n<li>Integration with existing equipment<\/li>\n\n\n\n<li>Space constraints requiring non-standard layouts<\/li>\n<\/ul>\n\n\n\n<p><strong>Question to ask:<\/strong> &#8220;Can you show me an example of a custom solution you engineered for a client?&#8221;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-section-3-manufacturing-quality-questions-8-10\">Section 3: Manufacturing Quality (Questions 8-10)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-8-what-quality-certifications-do-they-hold\">\u2705 Question 8: What quality certifications do they hold?<\/h3>\n\n\n\n<p><strong>Minimum certifications:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>ISO 9001<\/strong> \u2014 Quality management system<\/li>\n\n\n\n<li><strong>CE marking<\/strong> \u2014 European safety compliance (if exporting to EU)<\/li>\n\n\n\n<li><strong>UL certification<\/strong> \u2014 US electrical safety (if exporting to USA)<\/li>\n<\/ul>\n\n\n\n<p><strong>Industry-specific certifications:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>USDA\/FDA<\/strong> \u2014 Food grade applications<\/li>\n\n\n\n<li><strong>Clean Room Class<\/strong> \u2014 Electronics\/pharmaceutical<\/li>\n\n\n\n<li><strong>Ex-rated<\/strong> \u2014 Explosive atmosphere environments<\/li>\n<\/ul>\n\n\n\n<p><strong>Verify:<\/strong> Ask for certificate numbers and verify directly with issuing bodies.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-9-what-materials-do-they-use-for-critical-components\">\u2705 Question 9: What materials do they use for critical components?<\/h3>\n\n\n\n<p><strong>Key components to specify:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Component<\/th><th>Standard Options<\/th><th>Premium Options<\/th><\/tr><\/thead><tbody><tr><td>Frame<\/td><td>Mild steel (painted)<\/td><td>Stainless steel 304\/316<\/td><\/tr><tr><td>Belt<\/td><td>PVC, rubber<\/td><td>PU, silicone, modular plastic<\/td><\/tr><tr><td>Rollers<\/td><td>Carbon steel<\/td><td>Stainless, UHMW<\/td><\/tr><tr><td>Bearings<\/td><td>Standard<\/td><td>Sealed, food-grade<\/td><\/tr><tr><td>Motor<\/td><td>Generic brand<\/td><td>SEW, Nord, Siemens<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Red flag:<\/strong> Supplier cannot or will not specify material grades and component brands.<\/p>\n\n\n\n<p><strong>Vitrans transparency:<\/strong> We provide complete bill of materials (BOM) with brand names and specifications before production begins.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-10-what-is-their-defect-rate-and-warranty-policy\">\u2705 Question 10: What is their defect rate and warranty policy?<\/h3>\n\n\n\n<p><strong>What to look for:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Defect rate below 2% (industry average is 3-5%)<\/li>\n\n\n\n<li>Minimum 12-month warranty on all components<\/li>\n\n\n\n<li>Clear warranty claim process<\/li>\n<\/ul>\n\n\n\n<p><strong>Warranty should cover:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Manufacturing defects<\/li>\n\n\n\n<li>Material failures<\/li>\n\n\n\n<li>Workmanship issues<\/li>\n<\/ul>\n\n\n\n<p><strong>Warranty typically excludes:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Normal wear items (belts, bearings)<\/li>\n\n\n\n<li>Damage from misuse or improper maintenance<\/li>\n\n\n\n<li>Modifications made by customer<\/li>\n<\/ul>\n\n\n\n<p><strong>Critical question:<\/strong> &#8220;What is your average response time for warranty claims?&#8221;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-section-4-commercial-terms-questions-11-13\">Section 4: Commercial Terms (Questions 11-13)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-11-is-the-pricing-fixed-or-subject-to-change\">\u2705 Question 11: Is the pricing fixed or subject to change?<\/h3>\n\n\n\n<p><strong>What to look for:<\/strong> Fixed-price contract with clear change order process<\/p>\n\n\n\n<p><strong>Common hidden costs:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Engineering revision fees<\/li>\n\n\n\n<li>Expedited shipping charges<\/li>\n\n\n\n<li>Installation supervision (often quoted separately)<\/li>\n\n\n\n<li>Training costs<\/li>\n\n\n\n<li>Spare parts packages<\/li>\n<\/ul>\n\n\n\n<p><strong>Protect yourself:<\/strong> Contract should state:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;Total price is fixed unless customer requests changes to approved specifications. Any change orders must be documented in writing with cost impact before work proceeds.&#8221;<\/p>\n<\/blockquote>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-12-what-are-the-payment-terms\">\u2705 Question 12: What are the payment terms?<\/h3>\n\n\n\n<p><strong>Industry standard:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>30% deposit with order<\/li>\n\n\n\n<li>40% after design approval \/ before production<\/li>\n\n\n\n<li>30% after FAT \/ before shipment<\/li>\n<\/ul>\n\n\n\n<p><strong>Red flags:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>100% upfront payment demanded<\/li>\n\n\n\n<li>No retention amount for warranty period<\/li>\n\n\n\n<li>Unclear milestone definitions<\/li>\n<\/ul>\n\n\n\n<p><strong>Negotiation tip:<\/strong> For large projects (&gt; $200K), negotiate 5-10% retention payable after successful commissioning.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-13-what-is-the-guaranteed-delivery-timeline\">\u2705 Question 13: What is the guaranteed delivery timeline?<\/h3>\n\n\n\n<p><strong>What to look for:<\/strong> Specific dates with penalty clauses for delays<\/p>\n\n\n\n<p><strong>Contract should specify:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Design approval deadline<\/li>\n\n\n\n<li>Production completion date<\/li>\n\n\n\n<li>Shipment date<\/li>\n\n\n\n<li>Site delivery date<\/li>\n<\/ul>\n\n\n\n<p><strong>Delay penalties:<\/strong> Typical clause:<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>&#8220;Supplier pays 0.5% of contract value per week for delays beyond agreed delivery date, up to maximum 10% of contract value.&#8221;<\/p>\n<\/blockquote>\n\n\n\n<p><strong>Force majeure:<\/strong> Ensure definition is reasonable (natural disasters, war) \u2014 not &#8220;material shortages&#8221; or &#8220;production scheduling.&#8221;<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-section-5-after-sales-support-questions-14-15\">Section 5: After-Sales Support (Questions 14-15)<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-14-what-technical-support-do-they-provide-post-installation\">\u2705 Question 14: What technical support do they provide post-installation?<\/h3>\n\n\n\n<p><strong>Support should include:<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Support Type<\/th><th>Response Time<\/th><th>Duration<\/th><\/tr><\/thead><tbody><tr><td>Phone\/email support<\/td><td>Within 24 hours<\/td><td>Lifetime<\/td><\/tr><tr><td>Remote troubleshooting<\/td><td>Within 48 hours<\/td><td>Warranty period<\/td><\/tr><tr><td>On-site service<\/td><td>3-7 days (varies)<\/td><td>As needed<\/td><\/tr><tr><td>Spare parts supply<\/td><td>5-10 days<\/td><td>10+ years<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Ask for:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dedicated account manager contact<\/li>\n\n\n\n<li>24\/7 emergency hotline number<\/li>\n\n\n\n<li>List of recommended spare parts<\/li>\n\n\n\n<li>Maintenance schedule documentation<\/li>\n<\/ul>\n\n\n\n<p><strong>Vitrans commitment:<\/strong> We provide lifetime technical support with 2-hour response time during business hours and dedicated spare parts inventory for all systems we manufacture.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-question-15-do-they-offer-training-programs\">\u2705 Question 15: Do they offer training programs?<\/h3>\n\n\n\n<p><strong>Training should cover:<\/strong><\/p>\n\n\n\n<p><strong>Operator training (1-2 days):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Safe startup\/shutdown procedures<\/li>\n\n\n\n<li>Daily inspection checklist<\/li>\n\n\n\n<li>Basic troubleshooting<\/li>\n\n\n\n<li>When to call for service<\/li>\n<\/ul>\n\n\n\n<p><strong>Maintenance training (2-3 days):<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Lubrication schedules<\/li>\n\n\n\n<li>Belt tracking adjustment<\/li>\n\n\n\n<li>Roller\/bearing replacement<\/li>\n\n\n\n<li>Electrical diagnostics<\/li>\n<\/ul>\n\n\n\n<p><strong>Training formats:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>On-site at your facility (preferred)<\/li>\n\n\n\n<li>At supplier&#8217;s factory<\/li>\n\n\n\n<li>Video-based remote training<\/li>\n<\/ul>\n\n\n\n<p><strong>Verify:<\/strong> Ask for sample training manuals or videos.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-bonus-site-visit-checklist\">Bonus: Site Visit Checklist<\/h2>\n\n\n\n<p>If possible, <strong>visit the supplier&#8217;s factory<\/strong> before signing. Look for:<\/p>\n\n\n\n<p>\u2705 Clean, organized production floor\u2705 Proper material storage (not stacked on dirt floor)\u2705 Active quality control stations\u2705 Skilled workers (not just general laborers)\u2705 Modern equipment (CNC, welding robots, test facilities)\u2705 Safety protocols being followed<\/p>\n\n\n\n<p><strong>Red flags during visit:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Excessive dust\/debris<\/li>\n\n\n\n<li>Materials exposed to weather<\/li>\n\n\n\n<li>No visible quality inspections<\/li>\n\n\n\n<li>High worker turnover (ask how long employees have been there)<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-summary-the-vitrans-difference\">Summary: The Vitrans Difference<\/h2>\n\n\n\n<p>At <strong>Vitrans<\/strong>, we welcome these questions because we&#8217;re confident in our answers:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Evaluation Criteria<\/th><th>Vitrans Standard<\/th><\/tr><\/thead><tbody><tr><td>Years in business<\/td><td>[X]+ years<\/td><\/tr><tr><td>Industry references<\/td><td>50+ across automotive, electronics, food, logistics<\/td><\/tr><tr><td>Engineering team<\/td><td>15+ in-house engineers<\/td><\/tr><tr><td>Quality certifications<\/td><td>ISO 9001, CE, UL<\/td><\/tr><tr><td>Warranty<\/td><td>24 months comprehensive<\/td><\/tr><tr><td>Delivery guarantee<\/td><td>Fixed timeline with penalty clause<\/td><\/tr><tr><td>After-sales support<\/td><td>Lifetime support, 2-hour response<\/td><\/tr><tr><td>Training<\/td><td>Included in every project<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-download-your-free-checklist\">Download Your Free Checklist<\/h2>\n\n\n\n<p>\ud83d\udce5 <strong>[Download PDF Version]<\/strong> \u2014 Printable 15-point checklist for supplier evaluations<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-ready-to-evaluate-vitrans\">Ready to Evaluate Vitrans?<\/h2>\n\n\n\n<p>We invite you to put us through this evaluation process. Contact us today:<\/p>\n\n\n\n<p>\ud83d\udce7 <strong>Email:<\/strong> <a href=\"mailto:qingsong.xu@vitrans.cn?subject=Hello\">qingsong.xu@vitrans.cn<\/a>\ud83d\udcde <strong>Phone:<\/strong> <a href=\"tel:+86%2018027652537\">+86 18027652537<\/a>\ud83c\udf10 <strong>Website:<\/strong> <a href=\"https:\/\/www.vitrans-conveyor.com\/\">www.vitrans-conveyor.com<\/a><\/p>\n\n\n\n<p><strong>Free consultation:<\/strong> Share your requirements, and we&#8217;ll provide a preliminary layout and quote within 5 business days \u2014 no obligation.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p><strong>Related Articles:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>OEM vs Standard Conveyors: When Custom Manufacturing Makes Economic Sense<\/li>\n\n\n\n<li>Conveyor Installation Mistakes: 8 Errors That Cost Manufacturers Thousands<\/li>\n\n\n\n<li>Preventive Maintenance Schedule: Keep Your Conveyor Running 10+ Years<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n<\/div><!-- .vgblk-rw-wrapper -->","protected":false},"excerpt":{"rendered":"<p>Introduction Purchasing a conveyor system is a significant capital investment \u2014 often ranging from $50,000 to $500,000+ depending on your production line requirements. Yet many manufacturers rush into contracts without properly vetting suppliers, leading to: At Vitrans, we&#8217;ve seen countless examples of companies learning these lessons the hard way. That&#8217;s why we&#8217;ve created this comprehensive&#8230;<\/p>","protected":false},"author":1,"featured_media":992406,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21,16],"tags":[],"class_list":["post-993099","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-newsroom"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v23.2 (Yoast SEO v24.8.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing - Vitrans<\/title>\n<meta name=\"description\" content=\"Avoid costly conveyor mistakes. Use our 15-point supplier evaluation checklist to vet conveyor manufacturers before signing contracts. Free PDF download included.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vitrans-conveyor.com\/vi\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\" \/>\n<meta property=\"og:locale\" content=\"vi_VN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing\" \/>\n<meta property=\"og:description\" content=\"Avoid costly conveyor mistakes. Use our 15-point supplier evaluation checklist to vet conveyor manufacturers before signing contracts. Free PDF download included.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vitrans-conveyor.com\/vi\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\" \/>\n<meta property=\"og:site_name\" content=\"Vitrans\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-01T09:59:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-01T09:59:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1613\" \/>\n\t<meta property=\"og:image:height\" content=\"775\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Yuan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0110\u01b0\u1ee3c vi\u1ebft b\u1edfi\" \/>\n\t<meta name=\"twitter:data1\" content=\"Yuan\" \/>\n\t<meta name=\"twitter:label2\" content=\"\u01af\u1edbc t\u00ednh th\u1eddi gian \u0111\u1ecdc\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 ph\u00fat\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\"},\"author\":{\"name\":\"Yuan\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#\/schema\/person\/272521a75bf3666b16e9234ac3a94303\"},\"headline\":\"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing\",\"datePublished\":\"2026-04-01T09:59:31+00:00\",\"dateModified\":\"2026-04-01T09:59:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\"},\"wordCount\":1387,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png\",\"articleSection\":[\"News\",\"Newsroom\"],\"inLanguage\":\"vi\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\",\"url\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\",\"name\":\"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing - Vitrans\",\"isPartOf\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png\",\"datePublished\":\"2026-04-01T09:59:31+00:00\",\"dateModified\":\"2026-04-01T09:59:42+00:00\",\"description\":\"Avoid costly conveyor mistakes. Use our 15-point supplier evaluation checklist to vet conveyor manufacturers before signing contracts. Free PDF download included.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#breadcrumb\"},\"inLanguage\":\"vi\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage\",\"url\":\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png\",\"contentUrl\":\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png\",\"width\":1613,\"height\":775},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.vitrans-conveyor.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#website\",\"url\":\"https:\/\/www.vitrans-conveyor.com\/\",\"name\":\"Vitrans\",\"description\":\"Vitrans-The world&#039;s leading automated line conveyor system\",\"publisher\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.vitrans-conveyor.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"vi\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#organization\",\"name\":\"Vitrans\",\"url\":\"https:\/\/www.vitrans-conveyor.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2024\/06\/2023-03-09-122815-e1719882885516.jpg\",\"contentUrl\":\"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2024\/06\/2023-03-09-122815-e1719882885516.jpg\",\"width\":1060,\"height\":197,\"caption\":\"Vitrans\"},\"image\":{\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#\/schema\/logo\/image\/\"},\"hasMerchantReturnPolicy\":{\"@type\":\"MerchantReturnPolicy\",\"merchantReturnLink\":\"https:\/\/www.vitrans-conveyor.com\/vi\/privacy-policy-2\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#\/schema\/person\/272521a75bf3666b16e9234ac3a94303\",\"name\":\"Yuan\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"vi\",\"@id\":\"https:\/\/www.vitrans-conveyor.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/d9897d4cb85ef6ec356ad8b19a2633aa2b33ed825a7f92cfb770d175e66552dc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/d9897d4cb85ef6ec356ad8b19a2633aa2b33ed825a7f92cfb770d175e66552dc?s=96&d=mm&r=g\",\"caption\":\"Yuan\"},\"sameAs\":[\"https:\/\/vitrans-conveyor.com\"],\"url\":\"https:\/\/www.vitrans-conveyor.com\/vi\/author\/test\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing - Vitrans","description":"Avoid costly conveyor mistakes. Use our 15-point supplier evaluation checklist to vet conveyor manufacturers before signing contracts. Free PDF download included.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vitrans-conveyor.com\/vi\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/","og_locale":"vi_VN","og_type":"article","og_title":"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing","og_description":"Avoid costly conveyor mistakes. Use our 15-point supplier evaluation checklist to vet conveyor manufacturers before signing contracts. Free PDF download included.","og_url":"https:\/\/www.vitrans-conveyor.com\/vi\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/","og_site_name":"Vitrans","article_published_time":"2026-04-01T09:59:31+00:00","article_modified_time":"2026-04-01T09:59:42+00:00","og_image":[{"width":1613,"height":775,"url":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png","type":"image\/png"}],"author":"Yuan","twitter_card":"summary_large_image","twitter_misc":{"\u0110\u01b0\u1ee3c vi\u1ebft b\u1edfi":"Yuan","\u01af\u1edbc t\u00ednh th\u1eddi gian \u0111\u1ecdc":"7 ph\u00fat"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#article","isPartOf":{"@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/"},"author":{"name":"Yuan","@id":"https:\/\/www.vitrans-conveyor.com\/#\/schema\/person\/272521a75bf3666b16e9234ac3a94303"},"headline":"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing","datePublished":"2026-04-01T09:59:31+00:00","dateModified":"2026-04-01T09:59:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/"},"wordCount":1387,"commentCount":0,"publisher":{"@id":"https:\/\/www.vitrans-conveyor.com\/#organization"},"image":{"@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png","articleSection":["News","Newsroom"],"inLanguage":"vi","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/","url":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/","name":"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing - Vitrans","isPartOf":{"@id":"https:\/\/www.vitrans-conveyor.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage"},"image":{"@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png","datePublished":"2026-04-01T09:59:31+00:00","dateModified":"2026-04-01T09:59:42+00:00","description":"Avoid costly conveyor mistakes. Use our 15-point supplier evaluation checklist to vet conveyor manufacturers before signing contracts. Free PDF download included.","breadcrumb":{"@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#breadcrumb"},"inLanguage":"vi","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/"]}]},{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#primaryimage","url":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png","contentUrl":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2025\/06\/1749711968878-e1749712516775.png","width":1613,"height":775},{"@type":"BreadcrumbList","@id":"https:\/\/www.vitrans-conveyor.com\/2026\/04\/01\/conveyor-supplier-evaluation-checklist-15-questions-to-ask-before-signing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.vitrans-conveyor.com\/"},{"@type":"ListItem","position":2,"name":"Conveyor Supplier Evaluation Checklist: 15 Questions to Ask Before Signing"}]},{"@type":"WebSite","@id":"https:\/\/www.vitrans-conveyor.com\/#website","url":"https:\/\/www.vitrans-conveyor.com\/","name":"Vitrans","description":"Vitrans-H\u1ec7 th\u1ed1ng b\u0103ng t\u1ea3i t\u1ef1 \u0111\u1ed9ng h\u00e0ng \u0111\u1ea7u th\u1ebf gi\u1edbi","publisher":{"@id":"https:\/\/www.vitrans-conveyor.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vitrans-conveyor.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"vi"},{"@type":"Organization","@id":"https:\/\/www.vitrans-conveyor.com\/#organization","name":"Vitrans","url":"https:\/\/www.vitrans-conveyor.com\/","logo":{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/www.vitrans-conveyor.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2024\/06\/2023-03-09-122815-e1719882885516.jpg","contentUrl":"https:\/\/www.vitrans-conveyor.com\/wp-content\/uploads\/2024\/06\/2023-03-09-122815-e1719882885516.jpg","width":1060,"height":197,"caption":"Vitrans"},"image":{"@id":"https:\/\/www.vitrans-conveyor.com\/#\/schema\/logo\/image\/"},"hasMerchantReturnPolicy":{"@type":"MerchantReturnPolicy","merchantReturnLink":"https:\/\/www.vitrans-conveyor.com\/vi\/privacy-policy-2\/"}},{"@type":"Person","@id":"https:\/\/www.vitrans-conveyor.com\/#\/schema\/person\/272521a75bf3666b16e9234ac3a94303","name":"Yuan","image":{"@type":"ImageObject","inLanguage":"vi","@id":"https:\/\/www.vitrans-conveyor.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/d9897d4cb85ef6ec356ad8b19a2633aa2b33ed825a7f92cfb770d175e66552dc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d9897d4cb85ef6ec356ad8b19a2633aa2b33ed825a7f92cfb770d175e66552dc?s=96&d=mm&r=g","caption":"Yuan"},"sameAs":["https:\/\/vitrans-conveyor.com"],"url":"https:\/\/www.vitrans-conveyor.com\/vi\/author\/test\/"}]}},"_links":{"self":[{"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/posts\/993099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/comments?post=993099"}],"version-history":[{"count":0,"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/posts\/993099\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/media\/992406"}],"wp:attachment":[{"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/media?parent=993099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/categories?post=993099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.vitrans-conveyor.com\/vi\/wp-json\/wp\/v2\/tags?post=993099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}